If you can dream it - we can design & build it
If you can dream it - we can design & build it

Design DAB 0401G

Designed with 190 square metres living space the integral garage of this 4-bedroom, 3-bathroom house can alternatively be extra reception or bedroom space.

 

Lounge  4.8m x 4.5m

Dining 4m x 3.8m

Kitchen 4.3m x 3.8m

Utility 3.8m x 1.8m

 

Bedroom 1 4.3m x 3.7m

Ensuite 2.7m x 1.7m

Bedroom 2 4.5m x 3m

Ensuite 2.6m x 1.7m

Bedroom 3 3.5m x 3.2m

Bedroom 4 3.7m x 3m

Family bathroom 3.5m x 2m

 

Integral garage 6m x 3m

The living areas of Design DAB 0401 are very flexible.  The kitchen, dining room and lounge can all be separate rooms - or completely open plan living is possible.  You may then wish to include the garage area as a separate room? 

 

Supply Only Timber Frame Kit DAB 0401G

 

 

 

Supply Only Design DAB 0402  

Supply Only Design DAB 0402G  

 

DAB 0402 / DAB 402G

 

The with and without garage of this family home design has four double bedrooms and two/three bathrooms (one/two ensure ensuite) with a great living area designed to be as open plan as you would like - from three individual rooms to one enormous living area more than 10.7m in length.

 

We propose a vaulted ceiling to the lounge with a large feature window to add grandeur to single storey living.

 

The garage extension can have a hip or gable roof and can either be configured for your car - or as a self-contained annexe with Bed 2 (previously the Master)

 

Lounge: 5m x 4.1m

Dining Room: 3.6m x 3.5m

Kitchen: 3.1m x 3.1m

 

Bedroom 1: 3.8m x 3.4m

Ensuite: 2.2m x 1.6m

or

Extended Ensuite 3.4m x 3m

Bedroom 2: 3.4m x 3m

Bedroom 3: 3.3m x 3m

Bedroom 4: 3.3m x 3m

 

Garage 6 x 3m

 

Timber Frame - Design & Build

Holmbush Woods, Stoke Road

Kelly Bray, Callington

PL17 8RA

T: 01579 388800

E: hello@timberframe-dab.co.uk

 

Open Invitation

We would be delighted to welcome you to our offices to enjoy a cuppa whilst we discuss your aspirations - perhaps you can bring the biscuits?

Christmas

We close the office and factory on Friday 21 December at 2pm as we are going for our team Christmas Luncheon.  Then we come back to work in 2019 - 0830 Wednesday 2 January 

Happy Christmas & Marvellous New Year ahead to all

Print Print | Sitemap
© Timber Frame - Design & Build